Answer: STEP-BY-STEP SUSPENDED SIGNS
|
|
|
Prepare the materials and tools.
Mark the position with a carpenters square  |
|
|
|
Wipe surface clean of dirt and grease on both extrusions.
Apply VHB primer to both extrusions.  |
|
|
|
Peel off backing.
Position the connector.  |
|
|
|
Press firmly.
Repeat steps 1-7 on opposite side.  |
|
|
|
Place the side with the connectors in the Alignment Jig.
Peel off backing from both connectors.  |
|
|
|
Carefully place second extrusion in place.
Apply pressure and repeat steps 1-12 for all other Sections of the sign.  |
|
|
|
Measure hanging cable and cut to length.
Insert the cable in to the channel on the connector.  |
|
|
|
Tighten the screws on the bottom section and leave the others loose.
Insert DC connector between the assembled sections, size as needed.  |
|
|
|
Pull up the slack and tighten the remainder of the screws.
Drill a leading hole with a 3mm(1/8") drill bit through both layers of the extrusion.  |
|
|
|
Enlarge hole with a 9mm (3/8") drill bit for the top layer of extrusion only.
View of the two holes.  |
|
|
|
Screw a self-tapping screw through the extrusion holes into the DC connector.
Insert the end caps.  |
|
|
|
2 Completed 2 tier sign ready for graphics. |
Please
SEND US
your question or suggestion |