Vista Sign Projects    
 
The Greenspan Center for Women's Health at the Kingston Hospital.
Hudson Valley Region of New York State.

 
 

Sign Manufacturer:

   
 
Timely Signs of Kingston, Inc.
Paul Beichert
Kingston , USA


Phone: 800-676-8710
eMail: mail@timelysigns.com
Website: www.timelysigns.com

Do you have a Vista project you would like to see published?
Submit your project Click here

   
  The main sign is fabricated from aluminum with LED lighting and is curved to follow the contour of the wall. This design was inspired by the Vista System which is used throughout the building.  
   
  Vista extrusion was used on this custom donor recognition panel to create a clean, contemporary feel.  
   
  Custom room dedication panels were created using Vista extrusion in conjunction with satin aluminum panels with digitally printed overlay films.  
   
  ADA Compliant room signs with tactile lettering and braille were created using the Vista System to match the donor recognition panels.  
   
  Another custom donor panel within the facility picks up the simple, contemporary curved design.  

The Greenspan Center for Women's Heath at the Kingston Hospital. Located in the Hudson Valley Region of New York State. Project designed, manufactured and installed by Timely Signs. Main facility sign fabricated by US Sign and Fabrication in Trumbull Connecticut

What was the customer/designer looking for from a design standpoint?
Our client was seeking new, interesting and non-traditional ways to honor the donors that made the project possible.

What did the customer request, what needs did they present and what problems did they need solved?
The client wanted 3 levels of giving for each room with corresponding ADA compliant signs that matched the donor recognition program. In addition, they wanted a main donor panel ouside the department that thanked all giving levels.

What problems did you run in to? (Manufacturing? Price? Technical? …)
The modular nature of the Vista System enabled us to easily meet all of the clients requirements without any problem.

How long did it take to complete the project?
Design, manufacturing and installation took approximately 6 months.

Describe if and how MCFT played a part in the project.
We've been using the Vista System for about 4 years on a number of projects, including banks, schools, health facilities, public and private institutions and retail outlets. It never fails to perform beyond our expectations and more importantly, it never fails to create a lasting image of quality for our clients.

Do you have a Vista project you would like to see published?
Submit your project Click here
 
 
usa@vistasystem.com